top of page
Relocation storm water network at w50 plot 23
Client:
H.H. Mohammed Saeed Al Badi
Consultant:
Winner Engineering
Scope:
Remove all existing storm water line and demolishing the existing inlet and catch basin and casting & installation new network out the plot and connect to the existing and handing over to ADM
Year:
2018
bottom of page